2017年7月18日星期二

Are you ready to install a concrete batch plant

Are you ready to install a concrete batch plant?

What would you do before install a concrete batch plant? Can you make sure it is well installed?

Let us talk about this each other.

Concrete batch plant construction machinery and equipment installed after the connection should be connected with the electronic control system. After the inspection is correct, by the mechanical and electrical personnel to carry out debugging. After the normal operation of the commissioning, record the batching time, weighing accuracy, and determine the technical parameters of concrete. For a variety of data, subject to acceptance by the user before they can be formally produced.

Before installing the concrete batch plant, the installer should familiarize themselves with the drawings and the relevant technical documents, select the appropriate lifting equipment, and according to the lifting equipment used to determine the installation program.

Concrete batching plant is ready to install with the lifting equipment should be based on the main roof height, mixing platform assembly quality elevation and weighing platform and the platform where the assembly quality and the platform where the elevation is equipped with, choose suitable lifting equipment.
The resource is from:

没有评论:

发表评论