Development of concrete batch plant should be equipped with two hydraulic
pipes, so as to be used for concrete truck failure, the use of other power to
unload the concrete tank. Appropriate spare picks, timely removal of concrete
mixing tank tank solidified concrete. Equipment maintenance, adjustment,
maintenance, cleaning, you must cut off the total power switch, and hung up the
“maintenance, forbidden to close” warning signs.
1, focus on maintenance to easy failed parts , and ensure the appropriate
accessories reserves;
2, contact with the power supply department, requiring it to provide a
reliable power guarantee;
3,Keep the backup generator good technical state;
4,Maintenance, ready to carry concrete transport vehicles. Only when the
device is ready to send the equipment ready information to the dispatch.