Tips for run-in period of 50m3 mobile batching plants

 The newly purchased concrete mixing plant will have a running-in period, and an yhzs50 mobile concrete batching plant is of no exception. The main task during the running-in period is to inspect the operation and stability of the equipment, to understand the details of all aspects of the equipment, so that the concrete mixing plant can pass the running-in period smoothly and give full play to its maximum performance. The matters needing attention are as follows.

1. Pay attention to the work load control during the running-in period of the 50m3 mobile batching plant. The work load during the running-in period should generally not exceed 80% of the rated work load, and proper workload should be deployed to prevent overheating caused by continuous operation of the machine for a long time The occurrence of the phenomenon.

yhzs50 mobile concrete batching plant

2. Operators should receive training and guidance from the manufacturer, have sufficient knowledge and understanding of the structure and performance of the machine, and obtain the corresponding operation and maintenance experience to operate the machine. The product manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, be sure to browse the manual for the concrete mixing plant, and operate and maintain according to the requirements of the manual.

3. Pay attention to frequently check the use of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water), and pay attention to check the sealing of the whole machine. In the inspection, it is found that the oil consumption is insufficient and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period.

4. Pay attention to frequently check the operation of each instrument. If any abnormality occurs, stop the machine and eliminate it in time. If the cause is not found, the operation should be terminated immediately before the failure is eliminated.

 

A YHZS50 mobile mixing plant equipment includes twin-shaft mixer, batching machine, cement silo and screw conveyor, computer control room. It adopts JS1000 twin-shaft forced mixer, which is a compulsory and high-efficiency equipment. It can produce plastic and dry concrete and other concretes. It has high production efficiency, short mixing time and beautiful appearance; the batching machine is PLD1600, batching Accurate and fast response, which can be adjusted according to user needs. Because of the small space occupied, the amount of capital occupied, and the production efficiency higher than a general mini mobile batching plant, the yhzs50 concrete batching plant has become an ideal model for bridge construction. If you can pass the running-in period safely, 50 plants will bring you high profits.