The mixing host JS750 of concrete batch plant

JS750 concrete mixer a discharge of 0.75m3, is also a small HZS35 concrete batch plant supporting the mixing host, with a uniform mixing, low power consumption, high productivity advantages, built-in eddy current mixer to prevent the unity of the material knot, etc., the forced concrete mixer, including eddy current mixing institutions, planetary mixing mechanism, discharge mouth, discharge agencies, mixing shaft, mixing rack and chassis and other parts.


JS series of concrete mixer is a double horizontal shaft forced concrete mixer, with stand-alone and PLD series of ingredients into a simple concrete batching plant of the dual advantages, but also for the batching plant to provide supporting host for all types of large and medium small concrete prefabricated components and roads, bridges, water conservancy, wharf and other industrial and civil construction projects, can be mixed with dry hard concrete, plastic concrete, mobile concrete, light orthopedic concrete and a variety of mortar, is a high efficiency models.
JS750 type concrete mixer belong to dual-axial concrete mixer, by combine with feeding mechanism, mixing mechanism, discharge, water supply system, electric control system and other parts.
JS750 concrete mixer with a reasonable structure, mixing quality, time is short, low energy consumption, low noise and other characteristics. Electrical control systems are used high-quality components, excellent performance, reliable high, with anti-Chongding function. The standard discharge capacity of the machine is 1.6m, 2.7m, 3.8m three (or user-defined), the user can use the dump truck or concrete mixer truck supporting the use of 1.6m discharge height can be directly with the concrete boom pump .
JS750 double horizontal shaft forced concrete mixer feed capacity is 750L, the discharge capacity of 1200L, the theoretical productivity of not less than 35 square per hour, the device has a reliable transmission, noise filial low energy consumption, compact structure, smooth operation, easy operation, Stirring a good quality, stirring force, power consumption is small, strong power, built-in eddy current mixer to prevent the material knot solidarity and other advantages
The resource is from:

2017年8月16日星期三

The basic technology process operation of concrete batch plant

Concrete batch plant equipment staff need to be familiar with the basic process of stirring the main points are as follows:

1, keep clean, drainage unblocked, the signal contact unobstructed;

2, feeding system should prevent institutions aggregate into operation;General sand and cement cannot be the same pipe groove;Hopper, tube slot parts of materials such as each time should be discharged net, shall not be reserved for the next feeding.


3, feeding: you can use a feeding and multiple feeding, a feeding material is in accordance with a certain order of the process into the cement mixer, but not allowed to vote the first cement, so as not to cement sticky axis; a feeding in order to avoid the cement is wrapped in water to form cement The ball should be the first cement and gravel stir, so that after the cement dispersed, and then shower; repeated mixing of concrete, also known as shelling concrete, it is more complicated feeding operation, in the concrete mixing station and mixing room need procedures for a special treatment can be achieved.

4, running, during the running one is to control the measurement accuracy, mixing time, ensure meet the process requirements;Second, check the abnormal and failure, such as discharging mouth without leaking slurry, etc., if there is abnormal and failure to timely maintenance.

5, downtime: must be out of the net before the concrete; work after the completion of the shutdown, the application of a small amount of stone and water washing forced concrete mixer; the same time, clean up the mixing site. When a sudden power failure or failure to stop, should be careful to operate in time to clean up the concrete within the host out.

6, security: any personnel must comply with operating procedures and safety precautions to ensure safety in production.