The acceptance criteria for concrete batch plant

How to determine whether the concrete batch plant qualified?Can be judged from six aspects.
1. If the concrete mixer of the concrete batching plant is from the fall-type mixing cylinder, then its discharge buckle radial run out does not exceed 1% of the diameter of the inlet, but also check the quality of the steel mesh on the blender screen Mesh and the reasonable size of the screen and check the installation accuracy of the screen;

2. The concrete mixing station transmission system should be flexible, no abnormal sound;
3. Concrete bath plant equipment in the belt conveyor, bucket elevator and cantilever shovel and other transmission to be smooth, flexible operation, the brake can be high, no abnormal noise, no card chain;
4. Check the measurement system is also very important, to check the measurement system sensitivity and accuracy;
5. Metering bucket into the material to be smooth, there is no accumulation of materials, such as material;

6. There is batching plant safety valve can not appear leak phenomenon; cement tank quality qualified; matching line installation should be reasonable, the equipment should be installed correctly.
The resource is from:
http://www.concretebatchingplants24.com/acceptance-criteria-concrete-batch-plant.html

2017年8月10日星期四

The price of small concrete batching plant

The price of a small concrete batching plant is usually below 600,000, and the price advantage of the small concrete batching plant makes it very popular. In contrast, the mini mobile batching plant has been widely used by virtue of the flexible maneuvering characteristics.


How much per hour of can belong to a small concrete batching plant

The professional batching plant manufacturer thinks that the production of 90 cubic meters of concrete mixing equipment is a small concrete mixing plant, mainly HZS25/35/50/60/75 small concrete batching plant models, including 25/35 square feet per hour of small cement Mixing station in the type of change is the most easy to move a model.

Haomei Machinery Equipment Co.,LTD is located in the famous machinery capital of Zhengzhou, China. We are professional machinery products manufacturer-featuring a wide range of quality concrete batching plant, mobile concrete plant, concrete pump, truck pump with boom, asphalt mixing plant,truck mixer, etc. We adhere to the policy of "QUALITY FIRST AND INTEGRITY WINS"to cooperate with clients from all over the world. Seeking for long-term relationship and mutual benefit is our unstoppable goal.

If you are in need of those machinery , please contact me via Email:sarah@concretebatchplant24.com
The resource is from:

2017年8月7日星期一

Semi-automatic and fully automatic concrete batch plant

The main difference between fully automatic and semi-automatic concrete batch plant is the control system, the other equipment are basically the same.


Fully automatic control system using automatic control system, semi-automatic control system using centralized control system; what is the difference of the concrete mixing plant in different control system ?

The production efficiency rating of the two ways are the same, the only difference is the different working methods; automatic control system as long as the point of operation, the material will automatically unload from the cement warehouse screw conveyor, in the screw conveyor. In the weighing bucket, and then automatically unloaded into the concrete mixer, the entire production process only need to point the operation will be completed automatically, very simple and convenient to use, very suitable for the staff of the concrete mixing plant; and centralized control system can not be so simple, it can be said to be step by step to complete, such as concrete work to the material, the point of the button on the material, then the material will be automatically transported to the weighing bucket, About the discharge button, the material will be automatically unloaded into the mixer, the centralized control system needs more people to participate.
The resource is from:

2017年8月6日星期日

What should pay attention to clean concrete batch plant

The cleaning of the concrete batch plant sounds like a very easy thing, but if done not well, it will directly affect the use of the concrete batching plant.

First, regular maintenance procedures under the provisions of the maintenance, maintenance operations, such as cleaning, lubrication, refueling and so on.
Second, it is forbidden to remove the concrete accumulated in the concrete mixing station tube with a sledgehammer method, which can only be removed with a chisel.
Third, in the cold season, after the completion of the application of water cleaning concrete mixer drum and water pump, water tank, water inside the water put the net, so as not to water pumps, water tanks, water pipes and other frozen.
Fourth, before the concrete mixing station working first check the controller is good, after stopping the use of water and stones into the mixing tube 10 to 15 minutes for cleaning, and then clear the water and stones. If the operator is required to enter the mixing cylinder to clean, in addition to cut off the power and remove the fuse, and to lock the switch box.
The resource is from:

2017年8月3日星期四

Installation instructions for concrete batch plant

Installation instructions of concrete batch plant supply with professional batching plant manufacturer, in the installation of concrete batch plant, please read it carefully.

The user to check all the installation equipment before the install the concrete batching plant, installation tools, check the equipment and tools are complete, whether there is a security risk and then install the program;
Installation should pay attention to safety, each employee must be equipped with safety tools, regardless of any equipment, lifting equipment, concrete mixing station to ensure that no one near, especially the following, when lifting must have a professional staff command; above security measures are pay attention to the installation can be assured after the installation; to check the installation of random size and correct the deviation;
Installation of any equipment, concrete mixing station after the end of a strong connection, after a good connection to carry out a careful inspection; installation of the flange connection surface and the discharge pipe flange connection surface should be coated with sealed objects;
In the installation of weighing hopper is sure to ensure the safety of the sensor;
Install the gas top and the valve must first check, the hose joints can not leak;

Installation of each equipment in the concrete batch plant to try to avoid the collision, bolts ,nuts and welding must ensure a strong place.
The resource is from:
http://www.concretebatchingplants24.com/installation-instructions-concrete-batch-plant.html

2017年8月2日星期三

The feeding sequence of concrete batch plant

As a concrete batch plant staff, do you clearly know about its feeding order? Take a look at it.

In the concrete batching plants mixing feed, usually will be used to put the stone first, then cement, and then followed by sand and water, why is this feeding? The main purpose is to ensure that stones, cement and other mixing evenly, to prevent cement with other coarse aggregate Wrapped together into the cement mixer, with water quickly after the formation of small cement aggregates, the smaller the water-cement ratio, the more serious this agglomeration.
Another reason is: small cement agglomerates attached to the coarse aggregate, the larger the coarse aggregate size, the smaller the cement agglomeration. And in the mixing process, due to the role of friction and impact, in the direction of the aggregate movement of small cement particles are effectively protected, the particle size is greater than the small cement aggregates several times or ten times the coarse aggregate into small cement aggregates of the protection of the barrier, so that part of the cement particles can not be broken after the end of mixing, to be hardened after the cement block filled with aggregate gap, resulting in reduced concrete strength, and even cause quality accidents.
The resource is from:

2017年8月1日星期二

How to choose the configuration for your concrete batch plant

Concrete batch plant reasonable configuration to ensure efficient operation, then how to choose a reasonable configuration?

Concrete batch plants configuration determines the level of their own production efficiency, so the choice of concrete mixing plant configuration to do the relevant preparatory work, when the production put into production, if you want to exchange will cause all aspects of the loss.
Professional batching plant manufacturer recommends that customers in the selection of equipment not only to rational use of the views of manufacturers, more importantly, but also in a timely manner to finally get a perfect batching plant equipment.
The most common configuration of the concrete bath plant is a series of concrete mixers, cement warehouses, conveyor equipment and weighing systems. So how do you make these bulk equipment a perfect set of operations, it needs all aspects of cooperation,In addition, we have a set of HZS25 concrete mixing plant(small concrete batching plant), the standard configuration is JS500 forced concrete mixer, PLD800 two warehouse concrete batching machine, and 50T cement tank, but if we configure the JS750 model concrete mixer will cause the ingredients shortage of ingredients, resulting in The standstill of the mixing station will ultimately affect its production efficiency.
Therefore, we must buy concrete mixing plant in a reasonable condition according to their actual situation to choose, can not blindly the most efficient and more efficient production. So the final situation is counterproductive.
The resource is from: